Home
>
1. ADS Directory
>
1.12 CD - 01 - Gas Plant - HSE.doc
>
1.12.8 HS06
|
Previous
Next
|
|
|
|
ACTIVITY
DESCRIPTION SHEET (ADS)
|
PROJECT:
|
GAS Plant FEED
Design
|
REV.:
|
0
|
PROJECT AREA
Level
1
|
FEED - Front End
Engineering Design
|
DISC: HSE
|
SUB-AREA
Level
2
|
Gas Sweetening
Plant
|
|
ACTIVITY
Level
3
|
Fire Protection and
Safety
|
CODE:HS06
|
ACTIVITY DESCRIPTION:
|
Develop Passive Fire Protection requirements for plant and
supporting structures including material selection and compliance
with lRoK regulations.
Prepare Active Fire Protection Philosophy
harmonized with RoK regulatory requirements. The report shall
contain plant and distribution sizing confirmed by a hydraulic
analysis.
Produce a Fire & Gas Philosophy, supplemented
by cause and effects information, detection selection and location
layouts.
Safety sign location philosophy and proposed
locations shall form part of this deliverable.
Compile a portfolio of Material Safety Data
sheets (MSDS).
Prepare a Safety
Equipment Specification.
|
INPUT
DATA:
|
HSE Basis of Design
Project
Documentation
|
DELIVERABLES:
|
Passive Fire Protection Report
Active Fire Protection report
F&G Philosophy;
Fire Protection layouts; Safety equipment and
Escape Route layouts
Material Safety Data Portfolio
Safety Equipment Specification
Safety and rescue Equipment Location Plan
FERA
|
NOTES:
|
|
|
|
|
|